SERVICE 01 / PLC & HMI PROGRAMMING

Control logic with an operator’s perspective.

Develop a new machine control system or make a carefully scoped change to an existing one. We bring operating sequences, equipment states and operator screens into one coherent engineering scope.

What the scope can cover

01

Sequence & interlock logic

Translate the agreed process into operating modes, start/stop sequences, permissives and fault handling.

02

HMI screen development

Organise overview screens, parameters, equipment status and alarms around the operator’s tasks.

03

Drives & communications

Define the device list, supported interfaces and information exchanged between the controller, drives and interface.

04

Existing-system changes

Review available source files and agree which existing behaviours must remain unchanged before modifying the program.

Agree the deliverables.

  • PLC and HMI project files, subject to the agreed platform and source-delivery terms
  • I/O and communication mapping within the contracted scope
  • A description of operating modes, interlocks and alarm behaviour
  • Test records and an agreed commissioning / handover checklist

A SUITABLE STARTING POINT

For equipment builders adding a control package, owners modifying an existing machine, or integrators who need a defined PLC/HMI software scope.

Review checkpoints

Use these questions to define the test scope. They are planning guidance, not a statement that an unrelated installation has already passed these checks.

Operating modes

Review manual, automatic, start/stop and restart behaviour against the agreed action list.

Permissives and fault handling

Identify the expected response to a missing condition, device fault and loss of a required signal.

Interface consistency

Match commands, feedback, data types and HMI units with the actual I/O and communication list.

Preservation during changes

Check the functions explicitly marked to remain unchanged and keep a verified pre-change backup.

What shapes the quotation

  • I/O count, equipment count and the number of distinct operating sequences
  • Number of HMI pages, parameters, alarm groups and communication devices
  • Usability of the existing source files, drawings and software versions
  • Available test hardware, onsite support and the agreed change/review rounds
Planning changes to an existing control system
Scope boundary

Machine safety, hardware suitability and onsite validation must be assessed for the actual application. Remote development does not replace an authorised person checking the physical equipment.

START WITH THE REQUIREMENT

Tell us what your
equipment needs to do.

A process description and an equipment list are a useful starting point.